Code · CFR · Title 10 — Energy · Part 52 — Licenses, Certifications, and Approvals for Nuclear Power Plants · § 52.24

§ 52.24. Issuance of early site permit.

368 words·~2 min read·/us/cfr/t10/s§ 52.24·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Link to an amendment published at 91 FR 20067, Apr. 15, 2026.
(a)After conducting a hearing under § 52.21 and receiving the report to be submitted by the ACRS under § 52.23, the Commission may issue an early site permit, in the form the Commission deems appropriate, if the Commission finds that:
(1)An application for an early site permit meets the applicable standards and requirements of the Act and the Commission's regulations;
(2)Notifications, if any, to other agencies or bodies have been duly made;
(3)There is reasonable assurance that the site is in conformity with the provisions of the Act, and the Commission's regulations;
(4)The applicant is technically qualified to engage in any activities authorized;
(5)The proposed inspections, tests, analyses and acceptance criteria, including any on emergency planning, are necessary and sufficient, within the scope of the early site permit, to provide reasonable assurance that the facility has been constructed and will be operated in conformity with the license, the provisions of the Act, and the Commission's regulations;
(6)Issuance of the permit will not be inimical to the common defense and security or to the health and safety of the public;
(7)Any significant adverse environmental impact resulting from activities requested under § 52.17(c) can be redressed; and
(8)The findings required by subpart A of 10 CFR part 51 have been made.
(b)The early site permit must specify the site characteristics, design parameters, and terms and conditions of the early site permit the Commission deems appropriate. Before issuance of either a construction permit or combined license referencing an early site permit, the Commission shall find that any relevant terms and conditions of the early site permit have been met. Any terms or conditions of the early site permit that could not be met by the time of issuance of the construction permit or combined license, must be set forth as terms or conditions of the construction permit or combined license.
(c)The early site permit shall specify those 10 CFR 50.10 activities requested under § 52.17(c) that the permit holder is authorized to perform. [72 FR 49517, Aug. 28, 2007, as amended at 72 FR 57447, Oct. 9, 2007]
Connections5 cite this · traces to 1
1 reference not yet in our index
  • 10 CFR 51
Citation graph
cites case law
§ 52.24
Issuance of early site permit.
Fed. Reg.×5
Cite10 CFR 51
Cites 2Cited by 5 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.